https://www.wsj.com/articles/the-u-s-military-has-an-explosive-problem-6e1a1049?mod=hp_lead_pos7
DoD invested $3.5M in the plant to aid in re-opening. Estes is currently running inert materials through the production equipment to validate that everything works as designed, and Estes says production should restart by Summer, 2023.
Lots of good pictures of the facility and its equipment are in the article.
DoD invested $3.5M in the plant to aid in re-opening. Estes is currently running inert materials through the production equipment to validate that everything works as designed, and Estes says production should restart by Summer, 2023.
Lots of good pictures of the facility and its equipment are in the article.